In the news

CLT in Scotland

Mar 23, 2017
In March 2017 the first CLT panels arrived in Glasgow for the start of CCG’s new 7 storey development, named the Yoker project. Smith and Wallwork has engineered the CLT structure and all its connections and Eurban are installing StoraEnso
read more

Big trusses

Mar 12, 2017
Last week saw the installation of the first set of long span steel bow-string trusses at the Stephen Perse Foundation. Smith and Wallwork engineered a hybrid CLT and steel structure that will provide new sports and classroom facilities at the
read more

CUBC opens

Jan 01, 2017
At the end of 2016 Cambridge University Boat Club completed their new training facility at Ely. Smith and Wallwork engineered a flood resilient hybrid load bearing masonry and concrete structure on top of which sits an iconic folded plate roof
read more

SaW in 2016

Dec 28, 2016
2016 was a busy year for Smith and Wallwork. In less than 5 years since starting Smith and Wallwork has managed to complete more than 20 projects at a value in excess of £100m. Projects completed in 2016 include Cambridge
read more

UCL Bartlett opening

Dec 18, 2016
Smith and Wallwork collaborated with Hawkins Brown to create a 7 storey feature stairs for the new home of the Bartlett School of Architecture at UCL. The building officially opened on Friday 16th December 2016 with Bob Shiel, head of
read more

RIBA Research Award

Dec 07, 2016
Smith and Wallwork research collaboration with Cambridge University and PLP wins RIBA Research Award. Our work on super-tall timber buildings won the design and technical category. The work has been led by Dr Michael Ramage and Dr Rob Foster at
read more
  • Archived news