Holy Cross School, Swindon

This project embraces modern methods of construction. We took prefabricated timber frame construction from the house building industry and adapted it for a new primary school. Feature exposed timber structure was also incorporated in the scheme to create interest for the pupils. Our civil engineering design incorporated sustainable drainage in the play areas and we successfully negotiated and designed the new highway layout required by the school (section 278).