Work continues Cambridge University Engineering Department Strong Floor structure at the new sit in Cambridge.

The Shutters have been struck, tendons pushed through ducts, currently monitoring concrete strength in preparation for post-tensioning.

Jacking supports to underside have been delivered to site – these will enable the slab to be lowered into position.