The temporary bridge at Clare College has now been removed.

3 years after its installation, it was time to say goodbye to the temporary bridge over the River Cam at Clare College. The bridge enabled the construction of phase 1b forming a temporary construction access route. 

Photo credit to @ A Cambridge Diary 
https://www.acambridgediary.co.uk/