30th September 2019
The latest photos from site at Magdalene CollegeĀ Cambridge where things are progressing at pace.
The latest photos from site at Magdalene CollegeĀ Cambridge where things are progressing at pace.
Glulams provided by Eurban / Neue Holzbau are going in at second floor level ready for the CLT floor slab.